Shoreline (bank) stabilization project at Big Lake State Park, 204 Lake Shore Drive, Craig, Missouri. The work includes a Base Bid Area and three Add Alternate Areas. The project is managed by the Office of Administration, Division of Facilities Management, Design and Construction for the Department of Natural Resources, Division of State Parks. Plans were designed by HDR Engineering Inc. and dated June 30, 2026.
Sheet Index
Notes
TIED CONCRETE BLOCK MAT SHALL BE FLEXAMAT PLUS, SHOREFLEX PRO, OR AN APPROVED EQUAL.
CONTRACTOR SHALL FIELD VERIFY EXTENTS OF STABILIZATION ALONGSIDE ENGINEER AND OWNER PRIOR TO CONSTRUCTION.
ALL TREES TO BE REMOVED SHALL BE VERIFIED WITH OWNER PRIOR TO REMOVAL.
TRAFFIC CONTROL NECESSARY TO CONSTRUCT IMPROVEMENTS SHOWN IS ENTIRELY THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE SUBSIDIARY TO OTHER PAY ITEMS.
TYPE II SEED PER SECTION 2920 SHALL BE USED FOR ALL PERMANENT SEEDING.
CONTRACTOR SHALL OBTAIN A LAND DISTURBANCE PERMIT FROM THE LOCAL JURISDICTION PRIOR TO COMMENCEMENT OF WORK.
OWNER'S ENGINEER AND MANUFACTURES REPRESENTATIVE SHALL BE ONSITE FOR THE START OF THE INSTALLATION.