CUNY Baruch College Field Building Renovation with Asbestos and HAZMAT Abatement – Project No. 389050

Active 2140462 RFQuConstruction - BuildingDormitory Authority of the State of New York
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Dormitory Authority of the State of New York (New York) posted this RFQu on Nov 3, 2026. Responses are due Dec 1, 2026. Category: Construction - Building. Solicitation number 2140462.

Solicitation details

General information

Solicitation number
2140462
Notice type
RFQu
Place of performance
New York

Agency and category

Agency
Dormitory Authority of the State of New York
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY

See the Eligibility Requirements further down in this document.

Scope of Work: Renovation of the 6th and 7th floor shell spaces for the fit-out of Student Life spaces; Cellar and rooftop cooling plant upgrades

Scope

Renovation of the 6th and 7th floor shell spaces for the fit-out of Student Life spaces; Cellar and rooftop cooling plant upgrades

Brief description of Infrastructure work & rigging of Mech equipment to MER in basement and Roof CT:

  • Design team assumes crane will be required for rigging rooftop elements and HVAC units for the fit-out.
  • Cellar rigging through the areaway between the three Baruch buildings on the block.

Additional information

Design: DD (60%) issued 9/18; Bid drawings scheduled for 11/20 issuance.

Current estimated construction costs: **$16.5M - $20M**

Estimated timeline: Assume straight construction timeline: 10 months (contingent on actual sequencing and lead times)

Project Labor Agreement

The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the *Form of Bid*. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO.

Similar open bids

In New York

More from Dormitory Authority of the State of New York

Open bids