Dormitory Authority of the State of New York (New York) posted this IFB on Oct 22, 2026. Responses are due Dec 3, 2026. Category: Construction - Building. Solicitation number 2140046.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Removal and installation of 2 heat exchangers, 9 pumps, 2 condensate pumps, domestic water filter system, HVAC Building Management Controls, door replacement and shaft wall installation, lead and asbestos abatement and electrical connections.
The estimated construction cost range is between **$1,500,000.00** and **$1,750,000.00**.
Removal and installation of 2 heat exchangers, 9 pumps, 2 condensate pumps, domestic water filter system, HVAC Building Management Controls, door replacement and shaft wall installation, lead and asbestos abatement and electrical connections.
A complete set of Contract Documents may be viewed and/or purchased online from Camelot Print and Copy Centers. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. [...] A purchase of a digital download is **required** to become a registered planholder.
The bidder or its principals shall have a minimum of five (5) years experience in similar work and shall provide to the Owner on the *Minimum Qualifications Form* a list of five (5) contracts of similar size, scope, and complexity to this Project completed or substantially completed within the last ten (10) years.
Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.