The scope of work includes the removal of two dual-fuel (gas and #2 fuel oil) domestic hot water tanks and associated valves, fittings, and appurtenances in the Academic Building 1 boiler room.
Estimated Cost Range: **$2,787,775.00 - $3,081,225.00**.
The removal includes all the associated piping for the cold water, domestic water, hot water supply, gas, fuel oil, breeching, and drains. The removal of all electrical wiring and conduits from the equipment. The removal of three circulating pumps, an existing mixing valve, and associated piping. Partial removal of the existing shaft from the basement to the 6th floor to allow for the installation of 3” city water and domestic hot water piping. Remove a section of the existing roof to install new heat pumps and pipe penetrations.
The new work includes the installation of new 15-ton air source heat pumps at the roof level and the installation of two new hot water heaters, including circulation pumps and associated aquastat, mixing valve, cold and hot water piping, and heat tracing, including but not limited to all Plumbing, electrical, architectural, structural, demolition and mechanical connections as shown in the bid documents.
The successful low bidder, as a condition of being awarded this Contract, will be required to execute the PLA described in the Information for Bidders and included in the Contract Documents. See Section 18.0 of the Information for Bidders of the Contract Documents for additional information. All subcontractors of every tier will be required to agree to be bound by the PLA.
A complete set of Contract Documents may be viewed and/or purchased online from Camelot Print and Copy Centers. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record.
The bidder or its principals shall have a minimum of five (5) years experience in similar work and shall provide to the Owner on the Minimum Qualifications Form a list of five (5) contracts of similar size, scope, and complexity to this Project completed or substantially completed within the last ten (10) years.
Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.
SDVOB Goal: 6.00%. MBE Goal: 18.00%. WBE Goal: 12.00%.