City of Charlotte (North Carolina) posted this ITB on Oct 15, 2026. Responses are due Nov 19, 2026. Category: Construction - Heavy & Civil. Solicitation number FY27-ITBCon-35.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Sealed Bids for the construction of the Collective Storm Drainage Improvement Project - Series AD will be received by the Contracts Administration Section of Charlotte Water in the First Floor Conference Room located at 5100 Brookshire Boulevard, Charlotte, NC 28216.
Collective SDIP Series AD consists of four projects: Tipperary Place 4213: This project is a rehabilitation of an existing 60 linear foot 8' x 6' RCBC. [...] Randolph Road 4023: This project will address failing infrastructure in Randolph Road. [...] Randolph Road 4600: This project will address failing infrastructure in Randolph Road and tail ditching at the outfall. [...] Vail Avenue 2607: This project will install storm drainage infrastructure to a portion of Vail Avenue to better capture runoff. The estimated cost for this project is $1,425,701.00.
Tipperary Place 4213: This project is a rehabilitation of an existing 60 linear foot 8' x 6' RCBC. The rehabilitation consists of four different methods including addressing exposed rebar, concrete elamination, and vegetation removal. All these methods will be addressed from inside the culvert or directly Infront of the headwalls.
Randolph Road 4023: This project will address failing infrastructure in Randolph Road. The project will remove and replace approximately 234 LF of 15" RCP. Water and Sewer relocations will be required. A phased traffic control plan will be required for improvements in Randolph Road right of way.
Randolph Road 4600: This project will address failing infrastructure in Randolph Road and tail ditching at the outfall. The proposed plan will remove and replace approximately 102 LF of 18" RCP. Sewer relocation will be required. A phased traffic control plan will be required for improvements in Randolph Road right of way.
Vail Avenue 2607: This project will install storm drainage infrastructure to a portion of Vail Avenue to better capture runoff. The proposed plan will install approximately 358 LF of 18" RCP, 36 LF of 24" RCP, and 10 structures. Approximately 500 LF of curb and gutter will be installed. Two sewer relocations will be required.
**Sealed Bids** will be received until **2:00 P.M. local time on November 19, 2026**, at which time the Bids received will be publicly opened and read.
**No construction bid submissions are allowed within the Procurement Portal.** All bids must be received in accordance with the instructions in the Invitation to Bid. Any bids submitted through the Procurement Portal will not be accepted.
Addenda, clarifications, and all other related information will be posted on the City of Charlotte's Procurement Portal at https://charlottenc.bonfirehub.com. Prospective Bidders are responsible for checking the Procurement Portal to obtain the latest information.
The Small Business Enterprise (SBE) Established Goal for this project has been set at 5.00%.
North Carolina laws and regulations apply. The right is reserved to reject any or all bids.
Sign up free to get these 3 documents.