RFP 2026-80 Sandy River Force Main River Crossing Project â?? Progressive Design-Build

Active S-C01010-00018309 RFPConstruction - Heavy & CivilClackamas County
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Clackamas County (Oregon) posted this RFP on Oct 29, 2026. Responses are due Dec 3, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-18 17:00. Solicitation number S-C01010-00018309.

Solicitation details

General information

Solicitation number
S-C01010-00018309
Notice type
RFP
Place of performance
Oregon
Questions due
2026-11-18 17:00

Agency and category

Agency
Clackamas County
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Clackamas Water Environment Services (District or Owner) is soliciting Proposals from those entities (Proposers) interested in contracting to serve as the Design-Builder for the design and construction of the Sandy River Force Main River Crossing Project (Project). The Owner is using Progressive Design-Build delivery for the Project.

The Project is to be designed and constructed in two phases:

  • Phase 1: Prepare design to 60% complete and a Guaranteed Maximum Price (GMP) proposal.
  • Phase 2: Complete design, construction and post-construction tasks, including performance testing, and startup commissioning (if GMP proposal is accepted by the Owner.).

The goal of this project is to design and construct the Project by December 2027.

Scope

The Sandy River Force Main River Crossing Project (Project) includes the planning, design, permitting, and construction of a permanent replacement for the existing Sandy River force main crossing and associated infrastructure.

The Work includes, but is not limited to:

  • Design and construction of a new force main crossing of the Sandy River
  • Evaluation and selection of optimal alignment and trenchless crossing method
  • Abandonment, removal, or decommissioning of the existing force main crossing
  • Modifications to the Sandy River Lane Pump Station and/or Timberline Rim Pump Station connections, as required
  • Removal of interim stabilization measures which have been constructed.
  • Testing, commissioning, and startup of the completed system

The final configuration of the Project will be developed during Phase 1 services.

Phase 1 services:

  • Produce the basis-of-design report for the sandy force main pipeline.
  • Perform engineering studies to support design and cost estimating.
  • Develop the engineering design and specifications for the Project
  • Prepare a project cost model and provide detailed cost estimates as the design is advanced at each design milestone.
  • Preparation and submission of Permit Applications to the various Regulatory Authorities as required to perform the work.
  • Assist Owner in identification of any temporary and permanent easements requirements.
  • Submit and negotiate a GMP to complete the Phase 2 services.

Phase 2 services:

  • Complete the final design and provide Professional Engineer certified and stamped documents (plans and specifications) for construction.
  • Procure equipment and subcontractors.
  • Secure necessary permits.
  • Construct Project.
  • Conduct commissioning and performance testing.
  • Provide warranty coverage.

Additional information

Proposals must be submitted in accordance with Section 5. The Proposals will be reviewed and evaluated using the best-value selection process described in Section 6.

No late Proposals will be accepted. Proposals may not be submitted by telephone or fax.

All communications shall be submitted by email to Twhitley@clackamas.us and shall specifically reference this RFP.

The Project will be Substantially Complete on or before **October 31, 2027** with Final Completion on or before **December 31, 2027**.

Owner may invite the two to three highest-scoring Proposers to an interview for the Project (Shortlisted Proposers).

Failure of the selected Proposer to execute a contract and deliver required insurance certificates within ten (10) calendar days after notification of an award may result in cancellation of the award.

Documents

8 files

Sign up free to get these 8 documents.

  • RFP 2026-80 Sandy River Force Main River Crossing Project Progressive Design-Build.pdf
    Download
  • 1 EJCDC Progressive Design Build Agreement.docx
    Download
  • 2- Design-Build-General Conditions.pdf
    Download
  • 3- PDB-Supplementary Conditions-Sandy River FM_Clean.docx
    Download
  • 1- Sandy River Lane Force Main Vulnerability Mitigation TM 9_25_2013.pdf
    Download
  • 2-2013 Sandy River Lane PS and Vulnerability Mit. app D.pdf
    Download
  • 3- Sandy River lane Force Main Asbuilt Drawings.pdf
    Download
  • 4- SandyRiverLaneFM_Temporary Protective Measures_AsBuilt.pdf
    Download

Similar open bids

In Oregon

More from Clackamas County

Open bids