Pennsylvania State System of Higher Education (Pennsylvania) posted this IFB on Nov 3, 2026. Responses are due Dec 10, 2026. Category: Construction - Building. Questions are due 2026-11-30 14:00. Solicitation number Millersville University, Lancaster County.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Work included under this Project consists of, but is not limited to, General Construction selective demolition of support areas, roof repair, GWB wall and removal/reinstallation of existing ACT ceiling; HVAC work includes selective demolition, new fan coils, pumps, piping, piping insulation equipment and building controls. Electrical work includes selective demolition, light fixtures and new circuits for HVAC equipment.
Work included under this Project consists of, but is not limited to, General Construction selective demolition of support areas, roof repair, GWB wall and removal/reinstallation of existing ACT ceiling; HVAC work includes selective demolition, new fan coils, pumps, piping, piping insulation equipment and building controls. Electrical work includes selective demolition, light fixtures and new circuits for HVAC equipment.
Contracts
**Bid Submission:** Upload bid proposal to PennBid website.
The completed *Bid Form* shall be PDF format and uploaded to the PennBid website not later than the bid due date and time to be considered as responsive to the bid requirements. Bidders submitting bids for more than one separate prime contract shall prepare and upload separate Bid Forms.
Items Required to be Submitted with the Bid
**Performance, Payment, and Maintenance Bonds Required with the Contract:** 100% of awarded Contract Price.
Bids shall be valid for not less than 60 days.
The System intends to award a contract or contracts resulting from this IFB to the responsible bidder(s) who submitted a responsive bid(s) which represents the lowest price to the System based on the bid evaluation plan.
Required Completion Date: **July 30, 2027**. Liquidated Damages: $400/day for HVAC Contractor.
Prevailing Wages: Yes; Prevailing Wage Determination Serial Number 26-09404.
Bidders must obtain all bid documents from the PennBid Program website and no other bid exchanges to be eligible to submit a bid proposal.