GJ27-118 MIDA - General Contractor for Hill Aerospace Museum Gateway Expansion

Active GJ27-118 RFPConstruction - BuildingMilitary Installation Development Authority
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Military Installation Development Authority (Utah) posted this RFP on Oct 16, 2026. Responses are due Nov 6, 2026. Category: Construction - Building. Questions are due 2026-10-30 17:00. Solicitation number GJ27-118.

Solicitation details

General information

Solicitation number
GJ27-118
Notice type
RFP
Place of performance
Utah
Questions due
2026-10-30 17:00

Agency and category

Agency
Military Installation Development Authority
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

75th Air Base Wing/SABER, hereinafter referred to as “Construction Manger”, invites qualified, General Contractors to submit proposals for construction of the Hill Aerospace Museum Gateway Expansion Project at the Falcon Hill / Hill Air Force Base, in accordance with the requirements and instructions set forth in this Request for Proposal (“RFP”).

Scope

Refer to proposal documents and attachments for the project manual, drawings and plans, as well as documents for each of the following proposal alternate and cost breakdowns:

Schedule of Alternates

- Proposal Alternate #1: Gift Shop Glass Displays Opening

Additional Budgets or Allowances

  • Budget/Allowance: Weather/Winter conditions. Costs should be included in the cost proposal. Costs to be covered by the Contractor. Please list this cost as a separate line item on the cost proposal form.
  • Budget/Allowance - Pedestrian Traffic Control. Pedestrian traffic control and any costs related to project sequencing should be covered by the Contractor.
  • Budget/Allowance - Value Engineering. Any other proposed value engineering options from the Contractor will be reviewed. Please provide a separate breakout form to list any items.

Project Schedule

Anticipated build time is no longer than six (6) months.

If it is determined that this project will require more than six (6) months for completion to meet a fixed cost, provide the reasoning in the proposal.

Attachments

  • Attachment A: Cost Proposal Form
  • Attachment B: Project Drawings and Plans
  • Attachment C: Project Manual
  • Attachment D: Davis Bacon Wage Rates
  • Attachment E: Key Personnel Specifications

Davis Bacon wage compliance and certified payroll submission are **required**. Certified payrolls to be submitted on a monthly basis. Building permits and impact fees to be paid for by the Owner. Contracts will be based off of AIA form A101/A201.

Additional information

Submission

All proposals must be submitted electronically via the Utah Public Procurement Place (U3P) on or before November 6, at 5:00 pm (MST). Any proposal received after such time will be considered non-responsive. Offerors must submit two separate electronic files for each proposal: one technical proposal file and one cost proposal file.

**Mandatory** site visit: Proposals from Offerors who do not attend this mandatory site visit will be deemed non-responsive and will not be evaluated.

Evaluation

  • Schedule Experience and Team Experience: 25%, 125 points
  • Project Risk Identification and Mitigation Plan: 25%, 125 points
  • Cost: 50%, 250 points

The RFP shall be awarded to the highest scoring, responsive, and responsible offerer, meeting all stated RFP requirements.

Insurance and Bonds

Commercial General Liability limits of not less than One Million Dollars ($1,000,000.00) each occurrence, Two Million Dollars ($2,000,000.00) aggregate. Business Automobile Liability with policy limits of not less than One Million Dollars ($1,000,000.00) combined single limit per accident. Builders Risk Insurance on a completed-value basis for 100% of the total contract sum. The Contractor shall furnish Performance and Payment Bonds that include a Dual Obligee Rider naming MIDA and 75 ABW as co-obligees.

Other

Retainage: five percent (5%). Liquidated damages: $300 for each calendar day of delay.

Documents

6 files

Sign up free to get these 6 documents.

  • RFP for Hill Aerospace Museum Gateway Expansion Project.docx
    Download
  • Attachment A - Cost Proposal Form.xlsx
    Download
  • Attachment B - Project Drawings and Plans.pdf
    Download
  • Attachment C - Project Manual.pdf
    Download
  • Attachment D - Davis Bacon Wage Rates.pdf
    Download
  • Attachment E - Key Personnel Specifications.pdf
    Download

Similar open bids

In Utah