Military Installation Development Authority (Utah) posted this RFP on Oct 16, 2026. Responses are due Nov 6, 2026. Category: Construction - Building. Questions are due 2026-10-30 17:00. Solicitation number GJ27-118.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
75th Air Base Wing/SABER, hereinafter referred to as “Construction Manger”, invites qualified, General Contractors to submit proposals for construction of the Hill Aerospace Museum Gateway Expansion Project at the Falcon Hill / Hill Air Force Base, in accordance with the requirements and instructions set forth in this Request for Proposal (“RFP”).
Refer to proposal documents and attachments for the project manual, drawings and plans, as well as documents for each of the following proposal alternate and cost breakdowns:
Schedule of Alternates
- Proposal Alternate #1: Gift Shop Glass Displays Opening
Additional Budgets or Allowances
Project Schedule
Anticipated build time is no longer than six (6) months.
If it is determined that this project will require more than six (6) months for completion to meet a fixed cost, provide the reasoning in the proposal.
Attachments
Davis Bacon wage compliance and certified payroll submission are **required**. Certified payrolls to be submitted on a monthly basis. Building permits and impact fees to be paid for by the Owner. Contracts will be based off of AIA form A101/A201.
Submission
All proposals must be submitted electronically via the Utah Public Procurement Place (U3P) on or before November 6, at 5:00 pm (MST). Any proposal received after such time will be considered non-responsive. Offerors must submit two separate electronic files for each proposal: one technical proposal file and one cost proposal file.
**Mandatory** site visit: Proposals from Offerors who do not attend this mandatory site visit will be deemed non-responsive and will not be evaluated.
Evaluation
The RFP shall be awarded to the highest scoring, responsive, and responsible offerer, meeting all stated RFP requirements.
Insurance and Bonds
Commercial General Liability limits of not less than One Million Dollars ($1,000,000.00) each occurrence, Two Million Dollars ($2,000,000.00) aggregate. Business Automobile Liability with policy limits of not less than One Million Dollars ($1,000,000.00) combined single limit per accident. Builders Risk Insurance on a completed-value basis for 100% of the total contract sum. The Contractor shall furnish Performance and Payment Bonds that include a Dual Obligee Rider naming MIDA and 75 ABW as co-obligees.
Other
Retainage: five percent (5%). Liquidated damages: $300 for each calendar day of delay.