Neighborhood House (Utah) posted this IFB on Oct 27, 2026. Responses are due Nov 19, 2026. Category: Construction - Building. Questions are due 2026-11-12 17:00. Solicitation number RA27-132.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Neighborhood House proposes to improve the rear side of its facility by constructing an accessible route through the existing curb and landscape area and installing a new gate with panic hardware. The project is intended to remove a physical barrier, improve safe movement through the rear area, and provide a more usable route for participants, caregivers, visitors, and staff with mobility needs.
Neighborhood House serves children and adults at 1050 West 500 South in Salt Lake City.
This plan includes removal and restoration of landscaping, curb demolition, concrete installation, gutter grinding, a gate with panic hardware, temporary security, architectural plans, permit allowance, project supervision and coordination, debris removal, cleanup, and contingency.
Bids are to be submitted through U3P/Bonfire no later than November 19, 2026 at 5:00 PM.
Contractors must include a proposed project schedule with their bids, covering design, permitting, construction, inspections, and final completion.
The contract is to be awarded to the lowest responsible and responsive bidder, whose bid meets the requirements and criteria set forth in the document *PY25 Pre-Bid Orientation.Prime Contractor Compliance Checklist*.
This project is funded through the Community Development Block Grant (CDBG) Program administered by Salt Lake County and is subject to applicable federal labor standards, including the Davis-Bacon and Related Acts (DBRA). The selected contractor and all subcontractors must comply with the applicable federal prevailing wage requirements.
A **mandatory** pre-construction meeting with Salt Lake County will be required after contract execution and before any construction work begins.
To lock this Wage Determination, the contract must be signed within 90 days.
Sign up free to get these 3 documents.