Salt Lake County (Utah) posted this IFB on Oct 28, 2026. Responses are due Nov 17, 2026. Category: Waste Management & Recycling. Solicitation number Bonfire-e9aa957b.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Salt Lake County, on behalf of its Division of Flood Control, “County” is solicitating bids from qualified firms “Bidder / Contractor” to provide services for the loading, hauling and disposal of bulk materials resulting from the dredging of Lee Drain including (but not limited to) dredged sediment, riprap, sand, woody debris, and miscellaneous refuse. The County’s best estimate of the material quantity is approximately 13,850 tons. The County has divided the length of Lee Drain into seven zones; the County reserves the right to award only a portion of these zones based on available funding. Zone 1 will form the base bid. Zones 2, 3, 4, 5, 6, and 7 are assigned to Alternatives A, B, C, D, E, and F, respectively.
The County is considering two options, which are described below. The County may award either Option I or Option II based on total cost and operational considerations. The County reserves the right to reject the option with the lowest stated total cost for option 1 if option two is determined to be operationally in the County’s best interest.
Under either loading option, bidders are to provide trucks and drivers for hauling and disposal of dredged material located in each mapped segment. Material may be disposed of in any legal manner or location determined by the contractor. Contractor is responsible for maintaining appropriate tracking controls and BMPs for the duration of the project including cleaning and maintaining access roads and public streets as well as giving a 2-day notice prior to project start to Trever Swensen (801)-971-2146. Weekend and holiday work is prohibited.
Contractor is to legally dispose of hauled material at a designated landfill or other location of their choosing at which they have the legal authorization to dispose of the material. Weigh tickets will be required to determine actual quantities transported. The Contractor assumes all liability and holds Salt Lake County harmless if material is disposed of illegally. Material has been tested by the County and can be assumed to be acceptable for disposal at the Salt Lake County Landfill.
Payment shall be based on the actual net tons hauled and legally disposed of from each awarded zone, multiplied by the contract unit price per ton for that zone and the selected loading option. A ton is defined as 2,000 pounds.
**Submission:** Questions shall be submitted through our online solicitation system, Utah Public Procurement Place (U3P) powered by Bonfire. Do NOT contact the Agency, Division, Department, or other County officers or employees.
A site visit is to be held at the time and date specified in the Bonfire portal. The site visit will be held at 1640 S Gladiola Street, Salt Lake City, UT. It shall be the sole responsibility of the bidder to attend this site visit. Bidders not attending do so at their own risk.
Contractor must be bondable to a minimum of the not-to-exceed amount of **$250,000.00**. The Bid Bond should be submitted on *AIA Document A310*. Bidders must hold either an S-310 or E-100 license.
Bidders must complete and submit a minimum of two (2) completed reference forms as part of their bid. Bidders are required to have at least three (3) years of experience of services as described in this solicitation.
The Contract will be awarded to the lowest, responsive and responsible bidder, based on the lowest combination of base bid and prioritized alternates up to the budget amount, provided the bid is reasonable and in the best interests of the County to accept.
Contractor shall commence the Work on the date of the Notice to Proceed and complete the Work on or before **March 15th, 2027**. Liquidated damages are **$500.00** for each calendar day of delay.
Insurance: commercial general liability of $1,000,000 per occurrence with $2,000,000 general policy aggregate and $2,000,000 products completed operations aggregate; commercial automobile liability of $1,000,000 per occurrence; workers’ compensation as required by the State of Utah.