BL148-26, Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Active PE-77023-NONST-2027-000000793 ITBConstruction - Heavy & CivilGwinnett County
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Gwinnett County (Georgia) posted this ITB on Oct 21, 2026. Responses are due Dec 9, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-18 15:00. Solicitation number PE-77023-NONST-2027-000000793.

Solicitation details

General information

Solicitation number
PE-77023-NONST-2027-000000793
Notice type
ITB
Place of performance
Georgia
Questions due
2026-11-18 15:00

Agency and category

Agency
Gwinnett County
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Gwinnett County Board of Commissioners (Owner) is requesting Bids for the construction of the following Project pursuant to O.C.G.A. §36-91-20: Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation, F-0234-49.

This Project includes the following Work: Rehabilitation of a low-hazard (Category II) dam in Tribble Mill Park.

Scope

Rehabilitation of a low-hazard (Category II) dam in Tribble Mill Park including:

  • installing and maintaining erosion control measures, temporary access roads, and temporary pedestrian access measures;
  • draining the lake, constructing a cofferdam, and installing and maintaining a water diversion system;
  • demolition of the existing concrete riser, concrete impact basin, and portions of the spillway pipe and internal drain system adjacent to the riser and impact basin;
  • constructing a new concrete riser, concrete impact basin, rip-rap outlet channel, and portions of the spillway pipe and internal drain system adjacent to the riser and impact basin;
  • installing a cured-in-place pipe lining within the spillway pipe;
  • removing trees (including root balls) from portions of the dam and auxiliary spillway, performing surface repairs and minor grading, and establishing grass cover; and
  • removing all temporary facilities and restoring the site including erosion control measures, temporary access roads, temporary pedestrian access measures, and coffer dam.

Additional information

**Sealed Bids** must be delivered to Owner as specified in Section 00 21 13 *Instructions to Bidders* no later than **2:50 P.M. on December 9, 2026**, to be accepted. The bid opening will be virtual ONLY.

The Project is to be substantially complete and ready for operation within 365 days after the date when the Contract Times commence to run as provided in the General Conditions. The Project is to be complete and eligible for final payment 30 days after the date for Substantial Completion.

Drawings and Specifications must be obtained digitally from Hazen and Sawyer via QuestCDN (https://www.questcdn.com/) for a non-refundable fee of **$22** made online to QuestCDN. All Bidders are **required** to purchase a set of Bidding Documents. Only complete sets will be issued.

A **mandatory** pre-bid conference is scheduled, followed by an optional tour of the project Site. Bids are legal and binding upon the bidder when submitted.