Utah Division of Facilities Construction and Management (Utah) posted this ITB on Nov 5, 2026. Responses are due Dec 22, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-01 15:00. Solicitation number CS27028.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Mechanical & Site Civil Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.
WSU Waterline Replacement, Phase 3, Weber State University, Ogden, Utah. DFCM Project #20417810 | U3P Reference # CS27028.
Brief Project Description: Replacement of the culinary water and secondary irrigation mains along 4100 South at the south end of the WSU main campus, including associated vaults, valves, hydrant connections, and surface restoration.
Construction Budget:** **$1,400,000.00
Replace the existing mains with 12-inch culinary water and 10-inch secondary irrigation mains using Niron piping and associated connections as shown in the drawings. Work includes utility vaults, valves and fittings, new and reconnected fire hydrants, existing-system tie-ins, water interruption and shutdown coordination and removal or abandonment of existing facilities where indicated.
Include demolition, excavation, bedding, backfill and compaction, required testing and disinfection, erosion control, and restoration of disturbed pavement, curb and gutter, landscaping, and pavement markings in accordance with the project drawings and specifications.
Additive Alternates: N/A
Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. **Bid and Bid Bond Deadline: Tuesday, December 22, 2026, 3:00 PM.** After the bid deadline has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.
A **mandatory** meeting will be held; all prime Contractors wishing to bid on this project must attend and sign in.
Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations.
**Bid bond required:** a bid bond on the AIA Document A310 - 2010 Bid Bond form in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive.
**Subcontractor list required:** all Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by Wednesday, December 23, 2026, 3:00 PM.
The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond forms in the amount of **100% of the Contract Sum**. The bonds are to be emailed to dfcmcontracts@utah.gov within ten (10) business days of receipt of the Contract for signature.
Substantial Completion Date: August 13, 2027. Liquidated Damages: **$1,000.00 per day**.