DFCM Construction - VBS Construction Stage I - UDC - USCF Water Pump Station Modification & Fire Storage Tank- Project #26032100

Active MP27006-Stage 1 RFPConstruction - Heavy & CivilUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this RFP on Nov 4, 2026. Responses are due Dec 8, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-19 15:00. Solicitation number MP27006-Stage 1.

Solicitation details

General information

Solicitation number
MP27006-Stage 1
Notice type
RFP
Place of performance
Utah
Questions due
2026-11-19 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting proposals for construction services for the following project:

This project adds a dedicated fire water storage tank and new valve building to the USCF campus. The project is intended to separate the culinary water and fire water systems on the USCF campus.

Construction Cost Estimate:** **$2,500,000.00

Scope

There is an existing water pump station and culinary water tank on the east side of the prison facility. This project includes construction of a new 70-foot-diameter reinforced-concrete tank to store approximately 500,000 gallons of emergency backup water for the fire protection system if Salt Lake City water service is interrupted. The project also includes a small, 290-square-foot valve control building to support proper operation, minor piping modifications within the existing pump station, and new piping connections between the tank, valve control building, and pump station.

**Additive Alternates:** NA

Project Requirements

  • DFCM Approved Fabricator List
  • DFCM Design Management Documents
  • DFCM Roofing Design Requirements
  • State of Utah High Performance Building Standard and all appendixes

Additional information

**Substantial Completion Prior To:** November 15, 2027. **Liquidated Damages:** **$500.00 per day**.

All proposals must be submitted through the U3P website no later than the time and date specified on the Solicitation Schedule. Late proposals will not be accepted.

Proposal documents must be combined and uploaded as one PDF document. Hyperlinks to additional pages and external sources are not allowed and will not be assessed as part of the proposal. U3P has a 1 GB size limit for any individual upload.

The Selection Committee will short list all responsive and responsible Contractors who receive a minimum short listing score of 80 points. Short listed Contractors will be invited to bid during Stage II of the selection process.

  • Statement of Qualifications: 50 points
  • Management Plan: 35 points
  • Past Performance References: 15 points
  • Total Possible: 100 points

The *DFCM Termination or Debarment Form* is a **required** proposal document and shall be uploaded independent of Sections 1 – 4. Stage II: Invitation to Bid, Bid and Bid Bond Deadline: Thursday, January 7, 2027, 3:00 PM.

Documents

16 files

Sign up free to get these 16 documents.

  • 1-MP27006-26032100 Solicitation.pdf
    Download
  • 2-MP27006-26032100 Contractors Code of Conduct.pdf
    Download
  • 3-MP27006-26032100 Bid Schedule.pdf
    Download
  • 4-MP27006-26032100 Map.pdf
    Download
  • 5-MP27006-26032100 Approved Plans.pdf
    Download
  • 6-MP27006-26032100 Approved Specifications.pdf
    Download
  • 7-MP27006-26032100 Approved Structural Calculations.pdf
    Download
  • 8-MP27006-26032100 Geotechnical Report.pdf
    Download
  • A-Contractor Requirements for Stage II (VBS Stage I)
    Download
  • 2.12.25.pdf
    Download
  • B-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • C-DFCM Performance References Form 2.5.25 (1).docx
    Download
  • D-DFCM Termination or Debarment Certification Form
    Download
  • 5.8.25.docx
    Download
  • E-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids