DFCM Construction - Prequalified General Stage II - Department of Veterans and Military Affairs- Cemetery Committal Shelter- Project #27242490

Active CR27029 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Nov 2, 2026. Responses are due Nov 24, 2026. Category: Construction - Building. Questions are due 2026-11-12 15:00. Solicitation number CR27029.

Solicitation details

General information

Solicitation number
CR27029
Notice type
ITB
Place of performance
Utah
Questions due
2026-11-12 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified General Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.

**Cemetery Committal Shelter**, Department of Veterans and Military Affairs, Bluffdale, UT. DFCM Project #27242490 | U3P Reference # CR27029.

Construct new committal shelter. Construction materials will be primarily concrete block and steel framing. Shelter is purposed to provide protection from the elements during a graveside service. Will include some electrical work and minor impacts to the existing landscaping & irrigation.

Scope

Construct new committal shelter. Construction materials will be primarily concrete block and steel framing. Shelter is purposed to provide protection from the elements during a graveside service. Will include some electrical work and minor impacts to the existing landscaping & irrigation.

**Additive Alternates:** N/A

Project Requirements

  • DFCM Approved Fabricator List
  • DFCM Design Management Documents
  • DFCM Roofing Design Requirements
  • State of Utah High Performance Building Standard and all appendixes

Substantial Completion Date: April 30, 2027. Liquidated Damages: $750.00 per day. Construction Budget: **$765,000.00**.

Additional information

**Bids must be submitted via the U3P website** no later than the time and date specified on the Solicitation Schedule. [...] After the bid deadline listed on the Solicitation Schedule has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

All Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule. Subcontractor Lists Deadline is Wednesday, November 25, 2026, 3:00 PM.

The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond forms in the amount of 100% of the Contract Sum and secured from a company that meets the requirements specified in UAR 23-1-1102. The bonds are to be emailed to dfcmcontracts@utah.gov within ten (10) business days of receipt of the Contract for signature.

Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in their bid the cost of all items required by the solicitation.

Documents

9 files

Sign up free to get these 9 documents.

  • 1-CR27029-27242490 Solicitation.pdf
    Download
  • 2-CR27029-27242490 Approved Plans.pdf
    Download
  • 3-CR27029-27242490 Approved Specifications.pdf
    Download
  • 4-CR27029-27242490 Approved Structural Calculations.pdf
    Download
  • 5-CR27029-27242490 Geotechnical Report.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-Subcontractors List Form Instructions-7.1.2021.docx
    Download
  • C-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids