DFCM Construction - Prequalified Mechanical Stage II - Department of Workforce Services-Metro RTU, Boiler & Controls Upgrade - Project #27143920

Active CR27028 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Nov 2, 2026. Responses are due Dec 1, 2026. Category: Construction - Building. Questions are due 2026-11-17 15:00. Solicitation number CR27028.

Solicitation details

General information

Solicitation number
CR27028
Notice type
ITB
Place of performance
Utah
Questions due
2026-11-17 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Mechanical Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.

Brief Project Description: Mechanical Equipment and Controls Upgrade.

Construction Budget: **$750,000.00**

Scope

Remove and replace 2 steel tube boilers with new high-efficiency condensing boilers. Remove and replace the existing heating water pumps with new pumps, new VFDs, and new disconnects. Remove and replace piping, accessories, and specialties within the boiler room to accommodate the boiler and pump replacement. Remove and replace existing 90-ton VAV rooftop unit. Upgrade the controls from the old system to a new open protocol Niagara system. Remove and replace the existing VAV boxes with new boxes, new piping specialties, and new Niagara controls.

**Additive Alternates:** N/A

Project Requirements

  • DFCM Approved Fabricator List
  • DFCM Design Management Documents
  • DFCM Roofing Design Requirements
  • State of Utah High Performance Building Standard and all appendixes

Additional information

Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. [...] After the bid deadline listed on the Solicitation Schedule has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of 5% of the bid, or equivalent, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

All Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule. [...] Subcontractor Lists Deadline: Wednesday, December 2, 2026, 3:00 PM.

The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond forms in the amount of 100% of the Contract Sum and secured from a company that meets the requirements specified in UAR 23-1-1102.

Substantial Completion Date: June 30, 2027. Liquidated Damages: $500.00 per day.

Documents

8 files

Sign up free to get these 8 documents.

  • 1-CR27028-27143920 Solicitation.pdf
    Download
  • 2-CR27028-27143920 Approved Plans.pdf
    Download
  • 3-CR27028-27143920 Approved Specifications.pdf
    Download
  • 4-CR27028-27143920 Hazmat Survey.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-Subcontractors List Form Instructions-7.1.2021.docx
    Download
  • C-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids