Milwaukee Metropolitan Sewerage District (Wisconsin) posted this RFP on Oct 27, 2026. Responses are due Nov 24, 2026. Category: Architecture & Engineering. Questions are due 2026-11-17 14:00. Solicitation number C02010E03.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Milwaukee Metropolitan Sewerage District (District) is issuing this Request for Proposals (RFP) to solicit proposals from qualified vendors for preliminary engineering services related to the inspection and condition assessment of the Franklin-Muskego Force Main.
The purpose of this project is to assess the current condition of the Franklin-Muskego Force Main and associated cathodic protection system to develop recommendations and improvements to extend the useful life of the assets and maintain service to the area. The Franklin-Muskego Force Main conveys wastewater from the Cities of Muskego and Franklin to the District Metropolitan Interceptor Sewer (MIS). The force main was constructed in 1984 and includes approximately 16,090 total feet of polylined ductile iron pipe (DIP) with an 8-millimeter polyethylene exterior wrap.
The condition assessment will include the MIS force main that is owned and maintained by the District, including: the remainder of the 24-inch diameter force main from the Waukesha-Milwaukee County line to the St Martin Pump Station, the 30-inch diameter force main, and the 20-inch diameter force main, and the District cathodic protection system. The contract will also include condition assessment of the City of Muskego Force Main Assets.
This contract is meant to confirm those findings and perform the inspections and condition assessments recommended.
Goals
The overall contract includes the following major tasks:
- A. Project Management
- B. Preliminary Engineering
1. Project Kickoff & Reference Information
2. Inspection & Condition Assessment Plan
3. Bid Package Development – Force Main Inspection
4. Bid Package Development – Cathodic Protection Inspection
5. Bid & Award Services – Force Main Inspection
6. Bid & Award Services – Cathodic Protection Inspection
7. Engineering Services During Force Main Inspection
8. Engineering Services During Cathodic System Inspection
9. Preliminary Engineering Reporting – District Assets
10. Preliminary Engineering Reporting – Muskego Assets
The contract Scope of Services is in Attachment A.
**Submission method:** All proposals must be submitted electronically using the District’s Euna Procurement portal at https://mmsd.bonfirehub.com/projects/260237/details. All proposals must be submitted no later than **November 24, 2026 at 10 am CST**. Late submissions will not be accepted.
The District’s budget range for the Scope of Services outlined in Attachment A is **$200,000 to $275,000**.
The SBE participation goal for this contract (expressed as a percentage of the total contract dollar amount) is **20%**.
The RISE Intern Utilization goal for this contract is 1 RISE intern.
The selected proposer will provide proof of insurance coverage upon contract execution. The specific insurance requirements are detailed in the draft contract provided in Attachment E.
The District’s standard contract is a Fixed Hourly Rate plus Expenses Not to Exceed Contract, except where the contract is for “on-call” services.
Proposals will only be accepted from firms authorized to do business in the State of Wisconsin.