DFCM Construction - Prequalified Mechanical Stage II - Salt Lake Community College - RRC Heat Plant DA and Surge Tank Replacement - Project #27251660

Active CS27026 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Oct 28, 2026. Responses are due Dec 2, 2026. Category: Construction - Building. Questions are due 2026-11-19 15:00. Solicitation number CS27026.

Solicitation details

General information

Solicitation number
CS27026
Notice type
ITB
Place of performance
Utah
Questions due
2026-11-19 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Stage II Invitation to Bid

Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.

The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:

Project Description: Replace existing DA tank, condensate surge tank, associated pumps, and package controls. Add DDC controls to unit heaters.

Construction Cost Estimate: **$699,000.00**

Scope

This project includes mechanical engineering services for the SLCC RRC Heat Plant DA and Surge Tank Upgrades in Taylorsville, Utah. Work includes the removal and replacement of the existing deaerator (DA) tank, associated pumps, and package controls, as well as the removal and replacement of the existing condensate surge tank, pumps, and package controls.

The project will also replace the existing pneumatic controls, control valves, and associated components serving the unit heaters with standalone direct digital control (DDC) systems and new control valves to improve system performance, reliability, and controllability.

**Additive Alternates:** N/A

Project Requirements:

  • DFCM Approved Fabricator List
  • DFCM Design Management Documents
  • DFCM Roofing Design Requirements
  • State of Utah High Performance Building Standard and all appendixes

Additional information

Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. [...] After the bid deadline listed on the Solicitation Schedule has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P.

All Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule, **Thursday, December 3, 2026 3:00 PM**.

The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond forms in the amount of **100% of the Contract Sum** [...]. The bonds are to be emailed to dfcmcontracts@utah.gov within ten (10) business days of receipt of the Contract for signature.

Substantial Completion Date: March 19, 2027. Liquidated Damages: $1,000.00 per day.

A **mandatory** meeting will be held on the date and time and at the location specified on the Solicitation Schedule. All prime Contractors wishing to bid on this project must attend and sign in.

Documents

7 files

Sign up free to get these 7 documents.

  • 1-CS27026-27251660-Solicitation.pdf
    Download
  • 2-CS27026-27251660-Approved Plans.pdf
    Download
  • 3-CS27026-27251660-Approved Specs.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-Subcontractors List Form Instructions-7.1.2021.docx
    Download
  • C-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids