DFCM Construction - Standard Low Bid - Division of Facilities Construction and Management - Archives ASRS Upgrade - Project #26130310

Active CR27027 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Oct 22, 2026. Responses are due Nov 19, 2026. Category: Construction - Building. Questions are due 2026-11-10 15:00. Solicitation number CR27027.

Solicitation details

General information

Solicitation number
CR27027
Notice type
ITB
Place of performance
Utah
Questions due
2026-11-10 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids for Construction services for the following project: Archives ASRS Upgrade, Division of Facilities Construction and Management, Salt Lake City, Utah. DFCM Project #26130310 | U3P Reference # CR27027.

Brief Project Description: Design, fabricate, furnish, and install the complete WCS and Controls Work comprising the AS/RS modernization.

Construction Budget:** **$1,500,000.00

Scope

The project consists of modernizing the existing Automated Storage and Retrieval System (AS/RS) at the Utah Division of Archives and Records Service. Work includes replacement of the Warehouse Control System (WCS), modernization of the programmable logic controllers (PLCs), operator interfaces, electrical control panels, communications, and associated control systems. The project includes system programming, integration, testing, and commissioning. Existing AS/RS cranes, storage racks, and associated mechanical equipment will generally be retained.

**Additive Alternates:** N/A

**Substantial Completion Date:** April 30, 2027. **Liquidated Damages:** **$1,500.00 per day**.

Additional information

Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. [...] the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

**Mandatory** Bidder Qualification Requirements: Bidder must fill out the *Supplier Prequalification Questionnaire* which can be found under supporting documentation. The form is due by 3:00 PM, on Wednesday, November 4, 2026, via U3P. A "No" response to any question may disqualify the Bidder.

A bid bond [...] submitted on the AIA Document A310 – 2010 Bid Bond form, or equivalent, in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

All Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule (**Friday, November 20, 2026, 3:00 PM**). [...] If the *DFCM Subcontractors List Form* is not provided by the time and date specified on the Solicitation Schedule, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond forms in the amount of **100% of the Contract Sum** [...]. The bonds are to be emailed to dfcmcontracts@utah.gov within ten (10) business days of receipt of the Contract for signature.

Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in their bid the cost of all items required by the solicitation.

Documents

11 files

Sign up free to get these 11 documents.

  • 1-CR27027-26130310-Solicitation.pdf
    Download
  • 2-CR27027-26130310-Bid Schedule-496 ASRS.pdf
    Download
  • 3-CR27027-26130310-WCS Performance Specification-496 ASRS.pdf
    Download
  • 4-CR27027-26130310-Controls Performance Specification-496 ASRS.pdf
    Download
  • 5-CR27027-26130310-Description of Operations-496-AS-RS Modization Project.pdf
    Download
  • 6-CR27027-26130310-DFCM-Mandatory Bidder Prequalification Questionnaire-496 DARS ASRS.pdf
    Download
  • 7-CR27027-26130310-Specs-SA-26-496-01-02-03.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-Subcontractors List Form Instructions-7.1.2021.docx
    Download
  • C-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids